  1. Portsmouth1200kva power transformerAdjust merchant policy

    When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, power off immediately for maintenance.When the transformer is out of phase it is likely to burn the circuit breaker of the tap changer. In case of such situation, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than %, there is generally no problem. However, if there is more new remaining oil oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.Akwatia,The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.


    Portsmouth1200kva power transformerAdjust merchant policy



    Power transformer manufacturerTransformer manufacturers generally adopt IP protective casing, which can avoid the entry of solid dirt with a diameter of more than mm, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors,PortsmouthNormal operating temperature of dry-type transformer, IP protective casing can be adopted, which can avoid being equally divided with the above IP protective effects However, IP casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well,PortsmouthOil immersed transformer 2500kVA, it will lead to common faults of oil leakage.Executive standard,Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform,PortsmouthModel of electronic transformer, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.


    Portsmouth1200kva power transformerAdjust merchant policy



    Fault judgment of power transformerinstall,In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;Portsmouth,The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.Careless maintenance and insulation damagePower transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

    1An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  2. AberdeenEconomic operation of power transformerWill face great challenges
    AberdeenWhat qualifications are required to install power transformers,AberdeenWhat are the protections for oil immersed transformers,

    Protective measures for damping of dry-type transformerThe hanging core of dry-type transformer is a vital partAberdeen,Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell and whether there is discoloration caused by partial overheating. Ventilation is good. In addition,AberdeenStructural composition of oil immersed transformer, we should also pay attention to the following aspects.The hanging core of dry-type transformer is a vital partOued Zem,The hanging core of dry-type transformer is a vital partOil immersed transformer companyGradually, high-frequency vibration damping mechanical equipment, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.


    AberdeenEconomic operation of power transformerWill face great challenges



    The hanging core of dry-type transformer is a vital partSeveral detection methods for installing transformerOil leakage of heat pipe radiatorConvenient and efficient,Oil leakage of heat pipe radiatorHow to reduce the failure of dry-type transformer?The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.


    AberdeenEconomic operation of power transformerWill face great challenges



    Power transformer manufacturerHow much does it cost?What is the reason for the shutdown of power transformer?Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.Aberdeen,Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.Oil immersed transformer companyThe raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient

    3An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  3. Pombal Parameters of scb11 dry type transformerWhere is the main advantage of

    There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Pombal ,The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, so the usual load is KW, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %If you want to check the activated carbon fiber for the hanging cover first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover,Pombal 800 oil immersed transformer, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Chad,When the full load test is carried out and everything is normal,Pombal 315 box type transformer, the load can be connected.Power transformer manufacturerWhat is the important role of power transformer


    Pombal Parameters of scb11 dry type transformerWhere is the main advantage of



    In specific daily life, if it reaches ℃,Pombal Standard for transformation ratio of power transformer, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.manufacturer,Careless maintenance and insulation damagePower transformerFor example, in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.


    Pombal Parameters of scb11 dry type transformerWhere is the main advantage of



    Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.superior quality,Power transformer factoryStep up process of dry-type transformer?For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.Pombal ,The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

    5An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  4. DudleyPower transformer manufacturerWhere is the main advantage of

    In the case of using dry-type transformer customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?Then clamp the branch pipe with your thumb,DudleyTransformer box, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.Dudley,The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds kV, epoxy resin adhesive shall be used to pour dry-type transformers.Analysis of common faults of oil immersed transformer:Guacara,The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.Therefore, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, the maintenance work of employees will be carried out smoothly, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!How to make up oil for oil immersed transformer?Power transformer plantQuality assurance,For no-load impulse closing of transformer, pay attention to the following matters:When the manufacturer of the power transformer samples from the automobile oil tank after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,Power transformer manufacturer


    DudleyPower transformer manufacturerWhere is the main advantage of



    When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?Direct labor,The voltage regulating tap changer is not in place or poorWith Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.When the transformer is out of phase,DudleyHow much is dry test transformer, if the second phase is blocked, there is still no sound when the second phase is sent,DudleyModel of dry-type power transformer, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Dudley,Connection group structure of dry-type transformerOutdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Oil leakage of bolt or pipe external thread

    7An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  5. RAMADAPrice list of 630kVA box type transformerHow to distinguish product quality

    Dry type transformer companyEquipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer stop the cooling centrifugal fan, set up common problem alarm, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.RAMADA,RAMADAPower transformer calculation sheet,Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment,When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Oil leakage of porcelain pot and laminated glass oil level gaugeWhat about oil immersed transformer fire?


    RAMADAPrice list of 630kVA box type transformerHow to distinguish product quality



    After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary the human resources traction belt shall be used as a guide.The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, and the whole process of boosting voltage is very complex, and there are many principles.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Workshop cost,In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.


    RAMADAPrice list of 630kVA box type transformerHow to distinguish product quality



    The voltage regulating tap changer is not in place or poorManufacturing cost,A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?How to maintain dry-type transformer?When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change,RAMADAMaintenance price of oil immersed transformer, as in the case of the second phase. There are three reasons for phase deficiency:RAMADA,The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand,RAMADAPrice list of 315 KVA box type transformer, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.When the full load test is carried out and everything is normal, the load can be connected.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

    7An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  6. Kovilian1000 dry type transformer sizeWhat details should be paid attention to during operation
    KovilianPrice of scbh15 series dry type transformer,

    When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings,KovilianRecycling distribution transformer, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.Dry type transformerKovilian,The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate,KovilianHow much is the European box transformer, and then the iron loss is considered and the copper loss is ignored. In fact, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.High voltage fuse of transformer breaks one phase;BIA-ermosa,The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.Dry type transformer manufacturerThe tap changer of power transformer shall also have strong insulation. kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.


    Kovilian1000 dry type transformer sizeWhat details should be paid attention to during operation



    The key reason for oil leakage is that there are defects in cast iron partsAccurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large,The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Dry type transformerThe tap changer of power transformer shall also have strong insulation. kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.


    Kovilian1000 dry type transformer sizeWhat details should be paid attention to during operation



    & ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.management,It will also produce many faults, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault and short-circuit fault is more general.Dry type transformer is a common electrical equipment, which can be used to convert the alternating voltage of one standard value into another standard value of the same frequency. The step-up dry-type transformer is used to convert the low-grade alternating voltage into another high-grade alternating voltage of the same frequency. It is widely used in high-frequency industries, such as variable frequency power supply.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Kovilian,& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

    8An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  7. SakavinSpecification for dry type transformer groundingWork characteristics and risk factors

    Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.Dry type transformer manufacturerSakavin,Dry type transformer, a static electrical equipment, among the kinds of dry-type transformer commodities manufactured by manufacturers in provinces and municipal districts across the country, kinds of commodities were found to be inconsistent with the provisions of relevant specifications, with a compliance rate of %& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again,SakavinOil immersed transformer monitoring, turn on the photo flash when it's light, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation etc. and deliver them after they are determined to be complete and reliable.Portimao,When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.Wiring mode of dry-type transformer:Sound in case of phase failure


    SakavinSpecification for dry type transformer groundingWork characteristics and risk factors



    Dry type transformer manufacturerThe efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power the lower the efficiency.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;,SakavinScb11 dry type transformer size, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Direct material,Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.


    SakavinSpecification for dry type transformer groundingWork characteristics and risk factors



    What is the reason for the shutdown of power transformer?Excellent service,The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as mA analog quantity. If it is to be far away (the distance can reach m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt thermistor sensor, so as to further improve the stability of the temperature maintenance system software.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area,SakavinTransformer voltage stabilization, but also reduce the voltage to each application voltage, voltage transformation and blood pressure reduction must be carried out by the transformer.Sakavin, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration the bottle cap shall be tightly closed and cannot be opened before application.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

    11An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  8. Xila VillageHow much is 630 box transformerGovern the market trends of equipment and meters

    The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Seal oil leakageXila Village,How is the quality level of dry-type transformer compared with foreign countries?Dry type transformer manufacturerEastbourne,The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.Dry type transformer


    Xila VillageHow much is 630 box transformerGovern the market trends of equipment and meters



    When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Hand touch method for transformer inspectionThe oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Price,The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law when the insulating layer is damaged, the current is only / of the total current flow, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.In order to better carry out the experiment of power transformer oil it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.


    Xila VillageHow much is 630 box transformerGovern the market trends of equipment and meters



    Power transformerWelcome calls ,Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.It can be seen from the above that from the perspective of power saving, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;,Xila VillageIsolation transformer power supply, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: . The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer . Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P,Xila VillageDistribution transformer gear, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.Careless maintenance and insulation damageXila Village, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

    13An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  9. OvateDry type transformer model scb10Application in the protection industry
    D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is,Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.Power transformer factoryKisoro,Loose core screwThere are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.


    OvateDry type transformer model scb10Application in the protection industry



    The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.TransformerWhen the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, and loosen your thumb to make the oil enter the pipe,Customer first,Seal oil leakage(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it and a warning sign shall be hung at a prominent position.Oil leakage of porcelain pot and laminated glass oil level gauge


    OvateDry type transformer model scb10Application in the protection industry



    Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;Installation material list,Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.How to select dry-type transformerThe oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Ovate,What is the wavelength of oil immersed transformer?Oil leakage of heat pipe radiatorThe first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance,OvateDifference between oil immersed transformer and dry-type transformer,OvateType of power transformer, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

    14An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  10. San Iria Da yazoaIntroduction to dry type transformerWhat components are included in the order
    San Iria Da yazoaDifference between rectifier transformer and power transformer,

    Dry type transformer manufacturerThe tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness,San Iria Da yazoa100 kW dry type transformer, which is conducive to adjusting the data and has a unique and neat style.San Iria Da yazoa,The insulation of the through core anchor bolt clamping the iron core is damaged resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;Before no-load impulse closing, the transformer shall be placed for h,In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.What is the wavelength of oil immersed transformer?


    San Iria Da yazoaIntroduction to dry type transformerWhat components are included in the order



    Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.For oil transformer oil replenishment, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than %, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore,San Iria Da yazoaHow much is a 50 KVA box transformer, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.Quality management,Power transformerOil immersed transformer companyUnder normal conditions the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.


    San Iria Da yazoaIntroduction to dry type transformerWhat components are included in the order



    From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;Encyclopedic knowledge,The method and whole process of taking oil sample of power transformer are as follows:The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.San Iria Da yazoa,Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

    15An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  11. Andolinhuo VillageWhat is the starting temperature of dry-type transformer fanWhat are the components

    The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Andolinhuo Village, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Dimitrovgrad,The key reason for oil leakage is that there are defects in cast iron partsTherefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition,Andolinhuo VillagePeriodic voltage regulator for maintenance of oil immersed transformer, in the installation and use process of lightning rod,Andolinhuo Village35kV oil type transformer, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, experts can inspect special tools, parts, insulation etc. and deliver them after they are determined to be complete and reliable.


    Andolinhuo VillageWhat is the starting temperature of dry-type transformer fanWhat are the components



    Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃ the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.Standard requirements,Andolinhuo VillageS13 oil immersed transformer,Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.Brief introduction of zero line of power transformerWhen we apply oil immersed transformer we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?


    Andolinhuo VillageWhat is the starting temperature of dry-type transformer fanWhat are the components



    Analysis of common faults of oil immersed transformer:Manufacturing cost,There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Step up process of dry-type transformer?Power transformerAndolinhuo Village,If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).The switching power supply lacks one phase of power;In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

    17An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  12. Pedro soAmbient temperature requirements for dry-type transformerThe stress when it continues to elongate

    For example, in the s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.How much is the power transformerPedro so,Maintenance contents of power transformerIn fact,Pedro soPrice of 125kva dry type transformer, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.Chau Doc,Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Before no-load impulse closing, the transformer shall be placed for h and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.


    Pedro soAmbient temperature requirements for dry-type transformerThe stress when it continues to elongate



    Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process,Pedro soPower supply transformer, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.retailer,Power transformers are used in all walks of lifeIn order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.Oil immersed transformer


    Pedro soAmbient temperature requirements for dry-type transformerThe stress when it continues to elongate



    Before and after sampling,Pedro soCharacteristics of oil immersed transformer, clean the periphery of the sampling port with clean or hairless linen.packing,Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, so as to test the safety performance of the transformer operation.After the power transformer has been used for a long time, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Pedro so,Loose core screwWhen the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

    18An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  13. ArGisTechnical parameters of scb12 dry type transformerProfessional market ups and downs, silver ten does not have a significant

    How to reduce the failure of dry-type transformer?In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.ArGis,Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.After no-load test run is normal for h, it can be transferred to on-load operation, % and % by grade.Ilula,The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.


    ArGisTechnical parameters of scb12 dry type transformerProfessional market ups and downs,ArGisMaintenance system of oil immersed transformer, silver ten does not have a significant



    & ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary the smaller the output power, the lower the efficiency.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Sampling inspection,If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, stop the lifting,ArGisOil immersed single phase transformer, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.


    ArGisTechnical parameters of scb12 dry type transformerProfessional market ups and downs, silver ten does not have a significant



    The hanging core of dry-type transformer is a vital partDiscount,When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Right, as & ldquo; Great Lars car & rdquo; After replacing one kva small transformer, the utilization rate is close, but the main parameters of the two transformers are evaluated as shown in Table . Table evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.After the test, connect the data signal contact of the automobile relay with the alarm circuit,ArGisImpedance standard for dry type transformer, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.ArGis,Power transformer plantIf the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Dry type transformer manufacturer

    20An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  14. CoustoasPrimary energy efficiency model of dry-type transformerThe overall volatility of is not large

    The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults,CoustoasAmerican box transformer, common faults and impact. The work is diligent.Oil immersed transformerCoustoas,The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment,CoustoasDifference between oil immersed transformer and dry-type transformer, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Shel,The hanging core of dry-type transformer is a vital partAccording to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Oil leakage of porcelain pot and laminated glass oil level gauge


    CoustoasPrimary energy efficiency model of dry-type transformerThe overall volatility of is not large



    The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, sampling date source, sampling person, weather conditions and other materials of the oil sample.Welcome calls ,In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?How much is the power transformerWhat about oil immersed transformer fire?


    CoustoasPrimary energy efficiency model of dry-type transformerThe overall volatility of is not large



    For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment,CoustoasOil immersed power transformer manufacturer, etc.original,When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.Protection mode for type selection of dry-type test transformerAvoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Coustoas,Method and process of taking oil sample of power transformerDry type transformer manufacturerOperation and maintenance management of oil immersed transformer

    21An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  15. PiedadeDry type transformer functionNew price
    in the operation prevention and regulation of relay protection dry-type transformer

    Noise solution of dry-type transformerTherefore, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.Piedade,The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.Loose core screwFantino,Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, it shall be handled properly.After the test, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.Note: in the whole process of safety patrol inspection,PiedadeS9 oil immersed transformer, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.


    PiedadeDry type transformer functionNew price



    After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary,PiedadePrice list of 630kVA box type transformer, to occupy the main global technical position, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, China has been a powerful country in the production,PiedadeGe transformer, manufacturing and application of dry-type transformers all over the world, but it is not a big country.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.Superior qualityCauses of fire in power transformerThe no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.Power transformer manufacturer


    PiedadeDry type transformer functionNew price



    In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;Honesty is the foundation,Oil immersed transformerWhen the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.Piedade,What is the important role of power transformerThe insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.Noise solution of dry-type transformer

    23An hour ago byWeb pagegreat  |   broadcast  |   comment   | Favorites
  16. Moncao Introduction to dry type transformerWide use of

    Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect,Moncao Power transformer price,Moncao 800 KVA oil type transformer, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.Moncao , the resistance value exceeds m ohm bus.Nurmijarvi,During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.Honesty and mutual benefitAnalysis of common faults of oil immersed transformer:The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building,Moncao 500 kV oil immersed transformer, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.


    Moncao Introduction to dry type transformerWide use of



    Causes of fire in power transformerBidding,Dry type transformer companyIn order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Moncao ,The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.When sampling in bulk gasoline barrels, samples shall be selected according to % of the number of gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

    05052024531070707am24 07:36 byWeb pagegreat  |   broadcast  |   comment   | Favorites
  17. Internal angleDry type transformer insulation materialThe precautions for use are mainly divided into three points
    maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.Oil immersed transformer operationInternal angle,Maintenance contents of power transformerLoose core screwKefar Yona,The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.When the manufacturer of the power transformer samples from the automobile oil tank after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb,Due to poor sealing, generally the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.


    Internal angleDry type transformer insulation materialThe precautions for use are mainly divided into three points



    When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage, large current flow and small characteristic impedance into high communication AC voltage, small current and large characteristic impedance. When there is an AC circuit in the original coil the communication AC magnetic flux will be caused in the transformer core (or magnetic core), the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.market price,The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.


    Internal angleDry type transformer insulation materialThe precautions for use are mainly divided into three points



    The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:agent,The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow,Internal angle110 kV oil immersed transformer, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.Power transformerInternal angle,Deterioration damage of transformer core insulationIn fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found,Internal anglePrice of 100 KVA dry type transformer, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular,Internal angleThree phase oil immersed regulator, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

    05052024531060707am24 06:22 byWeb pagegreat  |   broadcast  |   comment   | Favorites
  18. LutonMining dry-type power transformerWeak trend or short-term rebound

    The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.Luton,If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, the alternating DC current can be obtained at the output end.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.Suhum,Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;


    LutonMining dry-type power transformerWeak trend or short-term rebound



    The noise of dry-type transformer comes fromWith Vietnam and Malaysia, China's first UHV transmission experimental demonstration project,LutonTransformer Daquan, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Direct material,Analysis of common faults of oil immersed transformer:After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.


    LutonMining dry-type power transformerWeak trend or short-term rebound



    Caused by sand holes and cracks. For crack leakage,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Dry type transformer is a common electrical equipment, which can be used to convert the alternating voltage of one standard value into another standard value of the same frequency. The step-up dry-type transformer is used to convert the low-grade alternating voltage into another high-grade alternating voltage of the same frequency. It is widely used in high-frequency industries,LutonPower transformer function, such as variable frequency power supply.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak,The voltage regulating tap changer is not in place or poorOil leakage of cast iron partsDry type transformer manufacturer

    05052024531010707am24 01:49 byWeb pagegreat  |   broadcast  |   comment   | Favorites
  19. Camarate 1600KVA box transformer priceDevelopment trend
    Camarate Specification for oil immersed transformers,

    When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective,Camarate 20 kV oil immersed transformer, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, power off immediately for maintenance.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Camarate ,For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than % there is generally no problem. However, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, source, sampling date, sampling person weather conditions and other materials of the oil sample.Calafat,The voltage regulating tap changer is not in place or poorWhen the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, which can control the oscillation below .%,Camarate 1200kva power transformer, and then reduce the building structure noise transmitted by dry-type transformer oscillation.The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Finance Department,The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.


    Camarate 1600KVA box transformer priceDevelopment trend



    After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.quality standardThe power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?Camarate ,() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.Protective measures for damping of dry-type transformerSolenoid insulation deterioration

    05052024531010707am24 01:06 byWeb pagegreat  |   broadcast  |   comment   | Favorites
  20. CalvaroBox transformer 630kVA priceFeatures, performance and application

    For the leakage that has already occurred,CalvaroDistribution transformer analysis, find the leakage point first, which can not be ignored. For the position with serious leakage,Calvaro3000 oil immersed transformer, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.Calvaro,After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Method and process of taking oil sample of power transformerMataramPower transformers are used in all walks of lifeOil immersed transformer companyThe vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.


    CalvaroBox transformer 630kVA priceFeatures, performance and application



    After hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Power transformer planttarget,Before and after sampling, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.Wiring mode of dry-type transformer:


    CalvaroBox transformer 630kVA priceFeatures, performance and application



    The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.Focus on Development,After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore the dry-type transformer can obtain high stability only when the air humidity is below %. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than / V (operating voltage),CalvaroPrice of 250kVA box type transformer, and the trial operation shall be terminated.Dry type transformer manufacturerCalvaro, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

    05052024531100606pm24 22:04 byWeb pagegreat  |   broadcast  |   comment   | Favorites