If the test results of square tubes fail to meet the provisions of product standards, the unqualified ones shall be selected, and double the number of samples shall be taken from the same batch of square tubes for re inspection of unqualified items. If the re inspection results (including any index required by the test of the project) are unqualified the batch of square tubes shall not be delivered. If the following inspection items fail to pass the preliminary inspection,HermondHexagonal square tube, re inspection is not allowed: A. There are white spots in the low magnification; b. Microscopic.Reinforcing phases such as reinforcing particles, short fibers and whiskers can be added to the solder to form composites.Hermond,After the square pipes are stacked and stored, the pipe end protector shall be removed to avoid moisture gathering on the surface of the pipe end protector and the square pipe, which is difficult to volatilize.Strength refers to the performance of metal materials under static load (excessive plastic deformation or fracture). Since the action modes of load include tension, bending and shear, the strength is also divided into tensile strength, compressive strength, flexural strength and shear strength. There is often a certain between various strengths. Generally, tensile strength is used as the basic strength indicator. Appropriate sites and warehouses shall be selected. The sites or warehouses for storing steel pipes shall be in clean and unobstructed places, away from factories and mines that produce harmful gas or dust. Weeds and sundries shall be removed on the site to keep the steel pipe clean; In the warehouse, it is not allowed to stack with acid, alkali, salt, cement and other materials that are corrosive to the steel pipe. Different types of steel pipes shall be stacked separately to prevent confusion and corrosion; Large section steel, rail, steel plate, large-diameter steel pipe forging, etc. can be stacked in the open air; Small and medium-sized section steel, wire rod, reinforcement, medium diameter steel pipe, steel wire and steel wire rope can be stored in a well ventilated shed, but they must be covered and padded; Some small steel pipes, steel sheets, steel strips, silicon steel sheets, or thin-walled steel pipes, all kinds of cold-rolled and cold drawn steel pipes and high and corrosive metal products can be stored in the warehouse; The warehouse shall be selected according to geographical conditions, and generally adopts ordinary closed warehouse, the warehouse with roof, enclosure, tight doors and windows and ventilation devices; The warehouse is required to pay attention to ventilation in sunny days,Hermond24 galvanized square pipe, close and damp proof in rainy days, and often maintain a suitable storage environment. The principle of reasonable stacking and first in first stacking is to stack according to varieties and specifications under the condition of stable stacking and ensuring safety. Materials of different varieties shall be stacked separately to prevent confusion and mutual corrosion; It is forbidden to store articles that have corrosive effect on steel pipes near the stacking position; The bottom of the stack shall be padded high, so as to facilitate the implementation of the principle of first in first out; The section steel stacked in the open air must be provided with wooden mats or strip stones. The stacking surface is slightly inclined to facilitate drainage. Pay attention to the straightness of the material placement to prevent bending and deformation; The stacking height shall not exceed m for manual operation, m for mechanical operation, and m for stacking width; A fixed channel shall be reserved between stacks, generally .m, and the access channel is generally ~ om depending on the size of materials and transportation machinery; The bottom of the stack shall be padded up. If the warehouse is cement floor, it can be padded up by .M; If it is muddy ground, it must be padded . ~ .m high. If it is an open site, the cement ground shall be padded with O & middot; ~O· m, the angle steel and channel steel shall be stacked in the open air, i.e. the mouth shall face down, and the I-beam shall be placed vertically. The i-groove surface of the steel pipe shall not face up to avoid ponding and rust. The packaging and protective layer of the protective materials shall be coated with agent or other plating and packaging before leaving the factory, which is an important measure to prevent material corrosion. Attention shall be paid to protection during transportation, loading and unloading and shall not be damaged, The storage period of materials can be extended, the warehouse shall be kept clean and the maintenance of materials shall be strengthened. Before warehousing, materials shall be prevented from being drenched or mixed with impurities. Materials that have been drenched or contaminated shall be wiped according to their properties, such as steel wire brush for high hardness and cloth cotton and other materials for low hardness; The materials shall be regularly after warehousing. If there is corrosion, the corrosion layer shall be removed; Generally, the steel pipe surface does not need to be coated with oil after being cleaned, but for high-quality steel, alloy steel sheet, thin-walled pipe, alloy steel pipe, etc., the internal and external surfaces need to be coated with anti rust oil before storage; Steel pipes with serious corrosion shall not be kept for a long time after rust removal and shall be used as soon as possible. With the development of economy, all kinds of square tubes, rectangular tubes, seamless square tubes, galvanized square tubes and galvanized tubes have been recognized by the majority of customers for a long time. There are more and more counterfeit products on the market. In order to prevent being deceived when you are in square tubes, you need to know some knowledge about how to judge the authenticity of square tubes: & ldquo; We can judge by observing the surface and flatness of the square tube. If the surface of the square tube is relatively flat, it can reflect that the square tube is good. On the contrary,The local heat release in the welding process of square tube can reduce the heat affected zone, avoid the micro of thermal sensitive materials, and maintain the properties of materials.Principle of cold drawing strengthening: the lattice defects of steel increase during plastic deformation, and the serious distortion of defect lattice will hinder the progress and slip of lattice, so the yield point of steel increases and the plasticity and toughness decrease. Due to the internal stress in plastic deformation, the modulus of steel decreases. The cold drawn reinforcement is stored at room temperature for ~ d or heated to ~ ℃ and maintained for a fixed time. This process is called aging treatment.So flat, and the size and thickness are not standardized, it can reflect that this square tube is a poor product& rdquo;
The second is to clean the surface of the opposite pipe. When cleaning the opposite pipe, the surface should be cleaned with solvent or emulsion. Square pipes of various specifications, square rectangular pipes, seamless square pipes, galvanized square pipes, galvanized pipes are supplied in time and cost-effective. They have become the preferred brand of many wire products. Welcome to buy! It is used to remove oil and dust. It is only suitable for removing grease and dust on the surface of square pipe, which can not remove rust and oxide scale. Therefore, it can only be used as an auxiliary means in production.After the square pipe is produced, the surface treatment is generally carried out, that is, the scale, rust, drill collar, core pipe, casing, sedimentation pipe, etc.Packaging strategy,Forging square tube: a kind of pressure processing in which the reciprocating impact force of the forging hammer or the pressure of the press changes the blank into the shape and size we need. It is generally divided into forging and die forging. It is often used to produce large-scale materials and materials with large square tube size.Square tube for automobile half shaft sleeve (gb-) is a high-quality carbon structural steel and alloy structural steel hot-rolled square tube for automobile half shaft sleeve and drive axle housing.Purpose of square tube the purpose of square tube includes construction, machinery, steel construction and other projects, shipbuilding, solar power generation support steel structure engineering, electric products ( pieces)
The square tube is divided into a. boiling steel according to the degree of deoxidation and pouring; b. Semi killed steel; c. Killed steel; d. Special killed steel. The deformation of qb square tube is mainly caused by the shrinkage force of the weld greater than the strength of the base metal.assets,Hot dip galvanized square pipe is widely used mainly in curtain wall, solar power generation support, construction, machinery and steel structure engineering, especially in curtain wall, machinery and construction. The effect of cold galvanized square tube is far from that of hot galvanized square tube; How to distinguish hot galvanized square pipe from cold galvanized square pipe?After the square tube is cut into a single square tube, the head and root of each batch of square tube shall be subject to strict first inspection. The mechanical properties, chemical composition, fusion condition, surface quality of square tube and NDT shall be carried out to ensure that the pipe making process is qualified before it can be officially put into production.Square tube is a very good steel in economic construction. There are many kinds and principles of cold drawing. You may still have a lot of insufficient understanding of the cold drawing principle of each other's pipe. Next, I'll lead you to learn its cold drawing principle.Hermond,Mechanical engineering, power plants, agricultural and chemical machinery, glass curtain walls, automobile chassis, airports, boiler construction, highway railings, housing construction, pressure vessels, oil storage tanks, bridges, power station equipment,HermondHot dip galvanized iron pipe, heavy transportation machinery and other welded structural parts with high load, etc. Process classification: according to the production process, square tubes are divided into hot-rolled seamless square tubes, cold drawn seamless square tubes, chemical and electrolytic pickling are used for pickling treatment. Only chemical pickling is used for pipelines, which can remove oxide scale, rust and old coatings. Professional square tubes rectangular tubes, seamless square tubes, galvanized square tubes and galvanized tubes are safe, environmentally friendly and economical! The products are exported to foreign countries and are deeply trusted. Sometimes they can be used as reprocessing after sand blasting and rust removal. Although chemical cleaning can make the surface reach a certain cleanliness and roughness its anchor lines are shallow and easy to pollute the environment.Solution treatment and nondestructive testing sand rolling treatment and sand blasting treatment many manufacturers in the market do not do solution treatment and % penetration nondestructive testing, the cost is greatly reduced.